Small batch

Small batch: 1 to 500 pieces, no tooling

For a prototype that has to be the real part, a repair piece for a machine that is already down, or a bridge order while a mould is being made. The difference from the OEM routeis simple: no tooling, stock material, and the first pieces are the sample.

From

1 piece

Lead time

10–15 days

Tooling

None

Quote

24 hours

Custom vs small batch

Custom (OEM)Small batch
Minimum quantity100 pcs per part number1 piece
ToolingQuoted per part where neededNone — machined from bar or plate
MaterialOrdered to the drawingStock grades only (list below)
Sample stageSample, then productionThe first pieces are the sample
Lead time25–35 days after sample approval10–15 days from drawing approval
Best forA part that will repeatA prototype, a repair part, a bridge order

Stock material for small batch

Small batch works because the material is already on the rack. These are the grades normally available without a mill order — sizes are typical, not guaranteed:

Aluminium 6061-T6Round bar Ø6–120 mm, plate 6–100 mm
Aluminium 7075-T6Round bar Ø10–80 mm
Stainless 303Round bar Ø4–100 mm
Stainless 304Round bar Ø4–80 mm, plate 3–50 mm
Stainless 316LRound bar Ø6–80 mm
Steel 1045Round bar Ø10–120 mm
Alloy steel 4140Round bar Ø12–100 mm
Brass H62Round bar Ø5–60 mm
POM (acetal)Round bar Ø8–100 mm, plate 6–50 mm
PTFERound bar Ø10–80 mm
PEEKRound bar Ø10–50 mm

What small batch is not good at

Being clear about this saves both sides a week. Four things that do not work at low quantity:

Tolerances tighter than ±0.01 mm on many featuresTight tolerancing is priced by inspection time, which dominates a 5-piece order.
Material not in the stock listWe can order it, but the mill minimum usually exceeds the part quantity. Ask first — sometimes it works.
Heat treatment or plating as a one-offThese are batch processes. A single part still pays the batch minimum.
Large parts above the bar capacityAbove Ø120 mm or 500 mm long, the setup cost stops making sense at small quantity.

For a prototype, send these three things

  1. 1 · The drawing, with the features that matter marked

    On a prototype, the tolerance that matters is usually one or two dimensions — the ones something else has to fit. Marking them means the rest can be machined at a sane tolerance and the price reflects it.

  2. 2 · The mating part

    If the new part fits an existing one, send both. This is the single most common cause of a prototype that arrives and does not assemble.

  3. 3 · What happens next

    A one-off repair, a test rig, or the first 5 pieces before a 5,000-piece order? The answer changes how we machine it — a prototype for testing can be made in a way a production part cannot.

Send the prototype drawing

From one piece, no tooling, 10–15 days from drawing approval. If the part will repeat, we will say so — and price both routes so you can see where the crossover is.