Part block

Machined seals, bushings and wear parts

Not every seal is moulded. Below a few thousand pieces, or when the geometry is a one-off repair part, machining PTFE, PEEK, POM or nylon is the cheaper route — and it is the one that holds a tolerance without a tool.

What we make in this block

Diameter rangeØ3 mm – Ø300 mm turned; rings and pads up to 400 mm milled
Tolerance±0.02 mm on plastics (they move more than metal); ±0.05 mm on filled PTFE
Thickness0.5 mm – 50 mm
MaterialsPTFE (virgin and glass/carbon filled), PEEK, POM (acetal), nylon PA6 / PA66, UHMW-PE, PPS, Vespel-type polyimide
Service temperaturePOM to 90 °C, nylon to 100 °C, PEEK to 250 °C, PTFE to 260 °C
Typical partsSeal rings, backup rings, bushings, wear pads, guides, insulators, rollers, gaskets
FinishesNone by default; annealing for PEEK and POM to relieve stress; laser marking on request

Plastic by application — the trade-off that usually decides it

MaterialFrictionTemperatureWearCost
PTFE (virgin)Lowest260 °CSoft, cold-flowsMedium
PTFE (glass filled)Low260 °CBetter creep resistanceMedium-high
PEEKLow-medium250 °CExcellentHigh
POMLow90 °CGoodLow
Nylon PA6Medium100 °CGood, absorbs moistureLow
UHMW-PEVery low80 °CExcellent abrasionLow

Processes, materials and finishes

Processes

  • CNC turning
  • CNC milling
  • Waterjet cutting (thin sheet)
  • Annealing
  • Deburring

Materials

  • PTFE virgin / glass filled / carbon filled
  • PEEK
  • POM (acetal)
  • Nylon PA6 / PA66
  • UHMW-PE
  • PPS
  • Polyimide

Finishes

  • None (as machined)
  • Annealing
  • Laser marking

How it is quoted

Minimum order100 pieces per part number (prototype quantities from 1)
Sample lead time7–10 days after drawing approval
Production lead time25–35 days after sample approval
Quote turnaroundWithin 24 hours, with DFM feedback

Specific part pages in this block

Technical reading for this block

Questions

When is machining a seal cheaper than moulding it?

Below roughly 2,000–5,000 pieces, depending on the geometry. A mould costs several thousand dollars and takes weeks; machining a PTFE ring costs a setup and a bar. Above that volume the mould wins.

Why do plastic parts measure wrong after machining?

Because the material moves after the cut. Plastics release internal stress when material is removed, so a ring machined to size can close up overnight. The fix is stress-relieved stock, annealing before the finish pass, or a stabilising allowance.

Can you hold H7 in POM or PTFE?

In POM yes, with care. In virgin PTFE it is not meaningful — the material cold-flows under load, so the bore changes in service. Filled PTFE or a PEEK bushing is the answer when the tolerance matters.

Do you supply food-contact or medical grades?

We machine the grade the drawing names, and the material certificate ships with the order. Whether a grade is suitable for food contact or medical use is a property of that grade and its certification, which the brand holds.

Send the drawing for seals and wear parts

Quotes come back within 24 hours with DFM feedback. Minimum order 100 pieces per part number; samples from one piece.

Other blocks