
Reference illustration — produced to your drawing
Screws
Particle Board Screws
A particle board screw has a deep, wide-spaced coarse thread and a flat countersunk head for fastening chipboard, MDF and other manufactured board. The deep thread grips low-density board without stripping.
It assembles flat-pack and panel furniture, cabinetry and joinery made from particle board. Furniture factories and shopfitters buy it where screws must hold in dense board edges.
Standard
To your drawing
Size range
#6 – #10 · 3.5 – 5 mm
MOQ
From 50 pcs
Lead time
Samples 5–10 days
What we produce
- Deep coarse thread for board edge grip
- Flat head countersinks below the surface
- Sharp point needs a small pilot hole
- Zinc-plated carbon steel standard
- Cross recess or square drive options
Specification notes
- Common lengths 13 mm to 60 mm
- Thread depth chosen by board density
- Pilot hole guidance supplied with orders
Specifications
Every line below is a starting point, not a limit. Non-standard sizes, special threads and unusual materials are what we do — send the drawing and we confirm what fits.
| Size range | #6 – #10 · 3.5 – 5 mm |
|---|---|
| Threads | Deep coarse thread |
| Head / geometry | Flat countersunk head; cross recess or square drive |
| Materials | Stainless steel 301 / 303 / 304 / 304L / 316 / 316L / 410 / 416 / 17-4PH · carbon steel 1045 / 1215 / 12L14 · alloy steel 4130 / 4140 · aluminium 2024 / 5052 / 6061 / 7075 · brass · bronze · copper · titanium |
| Finishes | As machined · black oxide · zinc plating · nickel plating · chrome plating · anodizing · passivation (through our vetted partner network) |
| Precision | ±0.01 mm on features that locate, seal or fit; ISO 2768-m for general dimensions |
| Marking | Head marking, grade marking or your own identification mark per drawing |
| Documents | Material certificate (MTR) with every batch, plus pre-shipment photos before dispatch |
| MOQ | From 50 pieces per type and material · samples from 1 piece |
| Sample lead time | 5–10 days |
| Production lead time | 25–35 days after sample approval |
| Quote | Within 24 hours, with DFM feedback |
Other screws we manufacture
See all 179 part types →Send us the drawing
We reply within 24 hours with DFM feedback, a process route and a price. Samples from 1 piece, production from 50 pieces, shipped from Qidong City, Jiangsu Province, China.
Request a quote